Project description: Supply and installation of solar photovoltaic system with a capacity of 54 kWp in the Doner factory in Drenas. Supply and installation of solar photovoltaic panels, installation of solar inverters, connection of cables and completion of protection frames. This system is expected to produce about 67,500 kWh per year. The energy produced will be used to reduce costs by up to 70% of the total consumption of the facility.